SHAH ALAM, 25 May 2018: MRCB George Kent Sdn Bhd (MRCBGK), the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a traffic diversion at the traffic light near Devi Sri Maha Karumariammam Temple at Persiaran Tengku Ampuan Rahimah. This diversion will start from 26 May 2018 to 31 August 2020.

The right turning into Jalan Tun Abdul Razak (from Banting-bound) at the traffic light in front of Devi Sri Maha Karumariammam Temple will be closed.
Motorists from Banting-bound wanting to turn into Jalan Tun Abdul Razak will be diverted to take a U-turn which is located in front of Masjid Al-Rahimiah as indicated by the GREEN arrows in the map.

The diversion is implemented following approval from the Public Works Department and the Klang Municipal Council. Motorists are reminded to exercise caution and adhere to advance warning signs when travelling in the area during the construction period.

We apologise for any inconvenience caused to the public.

Your kind understanding and patience are greatly appreciated as LRT3 is built for the betterment of the future, and in improving Klang Valley’s public transport system.

For public enquiries contact LRT3 hotline at 1 800 18 2585.

For media enquiries, contact:
Syukrina Mohtar
PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6860
syukrina@mrcbgk.com

Vanessa Song,
WPC PR & Stakeholder Management
Sunway Construction Sdn Bhd
012-232 3782
vanessas@sunway.com.my

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4th September 2015 as the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3).

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest home-grown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3)

The LRT3 envisages to connect 2 million people between Bandar Utama and Klang by 2020. Developed in line with Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, visit www.lrt3.com.my and follow @myLRT3

-->
Translate »