Media Release: Road closures and traffic diversions on Jalan Langat, Klang (adjacent to Klinik Kesihatan Bandar Botanic, both bounds) and Persiaran Kasuarina (from each end of the roundabouts, both bounds) to facilitate ‘U-trough’ launching and LRT3 project-related works from 23 October 2021 to 31 October 2021

 

 SHAH ALAM, SELANGOR – 21 October 2021: MRCB George Kent Sdn Bhd (MRCBGK), the main contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closures and traffic diversions on Jalan Langat, Klang (adjacent to Klinik Kesihatan Bandar Botanic, both bounds) and Persiaran Kasuarina (from each end of the roundabouts, both bounds) to facilitate ‘U-trough’ launching and LRT3 project-related works from 23 October 2021 to 31 October 2021, 10:00 p.m. to 5:00 a.m.

During the closure, motorists will be diverted as indicated below:

  • Motorists from Banting/KESAS heading towards Klang via Jalan Langat will be diverted to Persiaran Botanik, Jalan Batu Nilam 16, and Persiaran Batu Nilam 1 before heading back to Jalan Langat.
  • Motorists from Klang heading towards Banting/KESAS via Jalan Langat will be diverted to Jalan Salam before heading back to Jalan Langat.
  • Motorists from Persiaran Mahogani heading towards Persiaran Botanik via Persiaran Kasuarina will be diverted to Jalan Mahogani, Persiaran Batu Nilam 1 and Jalan Batu Nilam 16 before heading back to Persiaran Botanik.
  • Motorists from Persiaran Botanik heading towards Persiaran Mahogani via Persiaran Kasuarina will be diverted to Jalan Baru Nilam 16, Persiaran Batu Nilam 1 and Jalan Mahogani before heading back to Persiaran Mahogani.

 

The diversions are implemented following the approval from IPD Klang Selatan (PDRM), Klang Public Works Department (JKR Klang) and Klang Municipal Council (MPK). Throughout the National Recovery Plan (NRP) Phase 3 period, we will be following the guidelines of the Ministry of International Trade and Industry (MITI) and the Ministry of Health (MOH) when carrying out our construction activities. We apologise for any inconvenience caused to the public.

For public enquiries, please contact the LRT3 helpline at 1 800 18 2585.

 

-ENDS-

 

For media enquiries, please contact:

Lim Siew May

Media Manager, PR & Communications

MRCB George Kent Sdn Bhd

03-5033 6857

siewmay.lim@mrcbgk.com

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the main contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3

-->
Translate »
Notis Trafik: Penutupan Jalan dan Lencongan Trafik di Jalan Johan Setia, Klang (sebelum simpang lampu isyarat, arah Jalan Langat) dari 23 Oktober 2021 hingga 22 November 2021
October 21, 2021
Notis Trafik: Penutupan Jalan dan Lencongan Trafik di Jalan Langat (bersebelahan Klinik Kesihatan Bandar Botanik, kedua-dua arah) dan Persiaran Kasuarina, Klang (dari bulatan, kedua-dua arah) dari 23 Oktober 2021 hingga 31 Oktober 2021
October 21, 2021