-
-
Representatives from the pre-qualified contractors registering their attendance.
-
-
Mr. Ismail Shah Putra Samin, Vice President, Prasarana Rail and Infrastructure Projects Sdn Bhd (PRAISE), delivering the opening remarks.
-
-
Mr. Mohd Tarmizi Othman, Surveyor, Infrastructure Construction Management, MRCBGK, presenting the technical aspects of the package.
-
-
Mr. Winston Lam Kah Khoon, Manager, Contracts Management, MRCBGK, presenting the tender requirements.
-->
Translate »
Berita Harian:TRC peroleh kontrak RM760.55j daripada Prasarana
September 6, 2017Tender briefing (supervising consultant land surveyor services for Light Rail Transit 3 (LRT3) from Bandar Utama – Johan Setia)
September 13, 2017